Project Name : Gorgon - Subsea Equipment and Operations Support
Description :
GE Oil & Gas is a world leader in advanced technology equipment and services for all segments of the oil and gas industry, from drilling and production, LNG, pipelines and storage to industrial power generation, refining and petrochemicals, and also provide pipeline integrity solutions, including inspection and data management. As part of the 'Innovation Now' customer focus and commitment, GE Oil & Gas leverages technological innovation from other GE businesses, such as aviation and healthcare, to continuously improve oil and gas industry performance and productivity. GE Oil & Gas employs more than 12,000 people worldwide and operates in over 100 countries.

GE Oil & Gas has been awarded a frame agreement by Chevron Australia Pty Ltd, to supply subsea equipment and support services for the upstream section of the Gorgon Project at Barrow Island off the North-western coast of Australia, over a period of five years.

GE Oil & Gas is a leader in the supply of long offset subsea control systems to facilitate subsea-to-beach field developments and is supplying the following scope for the Gorgon project: manifolds, pipeline termination structures, pipeline end terminations, trees with subsea control modules, wellheads, production control systems, systems integration testing, installation and operations support.

GE Oil & Gas is looking for suitable suppliers to deliver equipment packages. Suppliers interested in providing the listed goods will need to demonstrate they have appropriate quality and safety processes in place, are competitive and capable of on-time delivery, and have a compliance culture.

Goods & Services required for this project.
* Items underlined and shown in blue provide additional information on packages, tenderers or the successful supplier
PDF PDF icons provide additional information on packages. To view information click on the PDF icon.  If required you can download Acrobat Reader by  Clicking Here
REF NO. FULL PACKAGE DESCRIPTION REGISTRATION CLOSES FULL PACKAGE COMPONENTS OF PACKAGE TENDERERS / SUPPLIER
MANPROP003
Supply of Clad Piping; 1.5D Bends, 5D Induction Bends, Concentric Reducers, End Caps, Equal Tees, Pipe, Reducing Tees, Sweepolets and WN Flanges. Material LTCS 415, NA 625, LTCS 450, MWP 450, DNV SMLS 415S, DNV SMLS 450S, DNV MWP 450 and Nickel Alloy 625 - UNS N06625. Approximate total weight 650 Tonnes.
Clad Piping  
Awarded
(7/10/2010)
View
MANFAB008
Fabrication of Gorgon manifolds, pipeline termination structure, foundations and lifting frames. Approximate total weight 2,650 Tonnes.
Fabrication Package No. 1  
Awarded
(7/10/2010)
View
MANFAB009
Fabrication of Jansz manifolds, pipeline termination structure, foundations and lifting frames. Approximate total weight 1,350 Tonnes.
Fabrication Package No. 2  
Awarded
(7/10/2010)
View
MANFAB010
Fabrication of Gorgon and Jansz midline pipeline termination structure, foundations and larger pig launchers / receivers. Approximate total weight 2,600 Tonnes.
Fabrication Package No. 3  
Awarded
(7/10/2010)
View
MANFAB011
Fabrication of Gorgon and Jansz pipeline end terminations. Approximate total weight 961 Tonnes.
Fabrication Package No. 4  
Awarded
(7/10/2010)
View
MANFAB012
Fabrication of Gorgon and Jansz small bore pig launchers / receivers. Approximate total weight 54 Tonnes.
Fabrication Package No. 5  
Awarded
(7/10/2010)
View
MANFAB013
Fabrication of Gorgon and Jansz central distribution units and foundations. Approximate total weight 140 Tonnes.
Fabrication Package No. 6  
Awarded
(7/10/2010)
View
MANFAB014
Prefabrication of kit required to complete all well jumpers and pipeline spools. Approximate total weight 2,810 Tonnes.
Fabrication Package No. 7  
Awarded
(7/10/2010)
View
MANFAB006
Design and fabrication of subsea connectors for temporary use during offshore installation of subsea structures. Pressure rating min. 15 bar, typical size 3” with straight through flow,service sea water and grout.Required units approx. 50 Female stab receptacles, 2-5 Male stabs
Grouting stab, receptacle and cap  
Awarded
(10/11/2010)
View
MANFAB001
Detail engineering and delivery of ROV operated protection hatches in GRP Glass fiber Reinforced PolyesterUsed for dropped objects protection of equipment on thesubsea structures typical 50 kJ impact energyTypical size 1300 x 2300 mm weight 100 kgRequired Units 100
GRP roof hatches  
Awarded
(9/3/2011)
View
PCSSUB001 Hydraulic Power Unit (HPU) Download PDF (24.87 kb)
Awarded
(17/3/2011)
View
MANPROP001
Instrument for measurement of inclination of structuresduring offshore installation.Required units 12.
Inclination indicator  
Awarded
(11/10/2010)
View
MANFAB002
Fabrication (welding and machining) and surface protection of steel hatches, for evacuation of air and water in foundation compartments on subsea structures during offshore installation. Typical hatch size diam. 1600 mm, weight 1400 kg. Required units approx. 40.
Mudmat hatches  
Awarded
(20/10/2010)
View
IWOCSSUB003
Design Assembly and Test of the pressurised conatiner which will be located in the drilling vessel in a hazardous area the container provides a location for safe working of the topside control system The container will house the UPS and master control station which will enable the electrical supply to the overall systemThe container will be pressurised and detect for hazardous gas ingress to the unitPower and communication cables will be transferred in and out of the container and when not in use stored within the unit
Pressurised Container  
Awarded
(4/8/2014)
View
MANPROP002
Rubber plug for flooding of structural profilesduring offshore installation.2000 units required.
Split Rubber grommets  
Awarded
(10/11/2010)
View
IWOCSSUB002
Design Assembly and Test of the Subsea Umbilical Termination Box which is the interface between the end of the umbilical and the treeThe subsea end of the umbilical is terminated within the SUTB so distributed from the SUTBare the Hydraulic and electrical flying leads which connect to the subsea treeThe SUTB will incorporate a guillotine to sever the flying leads during an emergency disconnect leaving the chopped leads behind and recovering the SUTB and guillotine as a wholeThere are two variants of SUTB one which lands on the seabed and one which lands on the LMRP
Subsea Umbilical Termination  Box (SUBT)  
Awarded
(19/5/2011)
View
MANFAB003
Isolation valve with flanged end connections in steel or plastic materials, for temporary use during offshore installation of subsea structures. Operation of the valve shall be by ROV according to ISO 13628. Typical size 3”, pressure rating min. 15 bar.Required Units approx. 80.
Suction and Grouting valves  
Awarded
(10/11/2010)
View
MANFAB004
Design, fabrication and surface protection of suction panel for temporary useduring offshore installation of subsea structures. The suction panel will include structural frame, front panel with ROV grab bar,3” isolation valves, 3” pipe manifold, manometers, marking and a stab receptaclefor connection of a hose from a suction pump (suction pumps and hose not part of suction panel).Pressure rating min. 15 bar, service sea water, size approx.1500 x 1200 x 1000 mm, weight 450 kg.Required Units 10.
Suction panel  
Awarded
(14/12/2010)
View
MANFAB005
Design and fabrication of subsea connectors for temporary useduring offshore installation of subsea structuresPressure rating min 15 bar typical size 3 with straight through flow service sea water and groutRequired units approx 50 Female stab receptacles 2 5 Male stabs
Suction stab, receptacle and cap  
Awarded
(10/11/2010)
View
IWOCSSUB001
Design Fabrication Assembly and Test of the Workover Hydraulic Power Unit WHPUThe WHPU is to be located on the drilling vessel to support the work over installation of a subsea treeThe WHPU will supply LP and HP hydraulic power directly to the tree through an umbilical and reelerLocated in a hazardous area the unit will be manually operated supplying only status feedbacks to the master control system
Workover Hydraulic Power Unit ( WHPU )  
Awarded
(26/8/2011)