ProjectConnect  
ProjectConnect Homepage HOME

REGISTER FOR SUPPLY OPPORTUNITIES
-
Current Projects Available for Gorgon Project
Back To Main Project >> Click the sub-project of interest below:
-
Project Name : Gorgon - Mechanical, Electrical and Instrumentation
Description : Chevron Australia Pty Ltd has awarded a contract to has awarded a contract to CB&I and Kentz Joint Venture, for the mechanical, electrical and instrumentation work on the Gorgon Project on Barrow Island, Western Australia. The contract has an estimated value of US$2.3 billion and is scheduled to be completed in 2015.

The contract work scope includes the structural, mechanical, piping, electrical, instrumentation and commissioning support for the construction of three LNG trains (with a total capacity of 15 million tonnes per annum), including associated utilities and a domestic gas processing and compression plant. The work will be performed by CBI Kentz JV, a joint venture between CB&I and Kentz.



The project will develop the Greater Gorgon gas fields, located between 130km and 200km off the northwest coast of Western Australia. The Greater Gorgon gas fields, Australia’s largest-known gas resource, contains about 40 trillion cubic feet of gas.

Goods & Services required for this project.
* Items underlined and shown in blue provide additional information on packages, tenderers or the successful supplier
PDF PDF icons provide additional information on packages. To view information click on the PDF icon.  If required you can download Acrobat Reader by  Clicking Here
REF NO. FULL PACKAGE DESCRIPTION REGISTRATION CLOSES FULL PACKAGE COMPONENTS OF PACKAGE TENDERERS / SUPPLIER
CKJV-CON-113
Subcontractor s Scope Of Work is to develop method statements and ITPs and to clean degrease random packings and flexrings to AGRU Vessels on both Barrow Island and at Subcontractors own Onshore Facilites
AGRU Degreasing Subcontract  
20/4/2012
CKJV-CON-110 Chemical cleaning Subcontract Download PDF (32.23 kb)
20/4/2012
BWI-CON-126
First filling of desiccants in the following equipment 1. Dehydrators 1C1201ABC 3 vessels, 2. Mercury Adsorber 1C1301, 1 vessel, 3. Instrument air dryer 0A4710ABC 3 vessels, 4. Nitrogen Generation 0A4801AB, VV2 4 vessels. Subcontractor to mobilise all necessary equipment not limited to hopper, loading bucket, hoseducts, blowers, socks, chutes, screen for dusting and manpower for the same. Desiccants and catalyst will be provided to the subcontractor on job location
Desiccant Loading  
30/10/2014
BWI-CON-124
General engineering house that would be able to carry out design calculations to show that some site built jigs and support structures are adequate for their intended purpose. These will be generally be temporary structures that will assist in the construction of the LNG facility. This could include lifting devices, Jacking frames, Temporary supports structures, Baskets to safely transport some construction equipment , Stability analysis of a partially constructed stick built structure or any other calculations
Design of Temporary Equipment  
31/3/2014
BWI-CON-115
Subcontractor shall mix and place cementitious and epoxy grout for shear keys foundations and equipment located on Barrow Island Subcontractor shall provide qualified experienced personnel and will be required to submit verification of qualifications prior to approval for mobilization to the site Mixing and placement of grout shall conform to stringent project specifications and quality control requirements Assigned personnel will be located on the Barrow Island project site on a rotational FIFO
Grouting Subcontract  
1/6/2012
CKJV-CON-108 Industrial Hygienist Subcontract Download PDF (18.52 kb)
22/2/2012
BWI-CON-125
Inspection, Commissioning, Testing and Marking of Cranes, Davit Arms and Monorails in the CKJV Stickbuilt Scope Of Work. All work to comply with the relevant, applicable Australian Standards, specifically AS 1418 Cranes, Hoists Winches. Scope Of Services to be provided by the SubContractor can be summarized as follows Preoperational inspection testing, ''No load'' operation and testing, load testing, marking, Documentation reports and certification. Subcontractor shall provide skilled personnel, any additional calibration and measuring equipment required that is not on site and all materials and equipment to carry out the required marking.
Load Testing of Cranes, Davit Arms and Monorails on BWI  
18/9/2014
CKJV-CON-126
Provision of safety training courses including frontline management, Verification of competency, Working at heights, confined space entry, oil spill response, manual handling and fire extinguisher. Subcontractor shall be responsible for provision of skilled personnel to execute the courses, maintain RTO registration, provide performance of assessment of participants and record keeping
Safety Training  
15/3/2015
AMC1-MAN-056
Design Approvals of Lifting Beams, Temporary Foundations and Supports at the AMC Yard for the CKJV Gorgon LNG MEI&C Project.
3rd Party Design Approvals ( No longer required)  
Closed
(1/09/2014)
CKJV-CON-014
Supply Accommodation and Transport for Non Local Crew, Staff prior to Mobilization and Accommodation for Overseas Staff at Henderson for the CKJV Gorgon LNG MEI&C Project.
Accommodation and Transport For Workforce and Staff.( No longer requir  
Closed
PTH-HR-102
Provision of Advertising services to do artwork and ad placements possibly in various media in support of the CKJV Gorgon LNG MEI&C Project.
Advertising Services ( No longer required)  
Closed
PTH-FAC-104
Supply of ceiling mounted supllementary air conditioning units for the fit out of CKVJs Perth CBD office
Airconditioning ( No longer required)  
Closed
BWI-FAC-100
Supply of airconditioning units and provision of servicing and maintenance services for these units on Barrow Island
Airconditioning Services ( No longer required)  
Closed
CKJV-MAN-036
Supply and fabricate Galv Anchor Bolts plus Galvanised Square Washers to AS3679.1 300 and A36 respectivelyfor the CKJV Gorgon LNG MEI&C Project.
Anchor Bolts ( No longer required)  
Closed
CKJV-HR-111
Audiometric testing compliant with Workcover (WA) requirements. Services to include provision of audiometric booth,audiometer, technician to attend BWI as required for testing and documentation sent to Workcover. Fit Testing services for respirator and hearing protection also required. Services to include provision of fit test equipment, technician to attend site as required for testing and supporting documentation. All equipment will need to be supplied, maintained and repaired and calibrated.
Audiometric Testing ( No longer required)  
Closed
CKJV-FAC-087
Supply all Necessary Banners Required for the CKJV Gorgon LNG MEI&C Project.
Banners ( No longer required)  
Closed
PTH-HR-098
Supply of custom belt buckles and artwork required for the CKJV Gorgon LNG MEI&C Project.
Belt Buckles ( No longer required)  
Closed
AMC1-MAN-071
Supply of Boom Lifts 45ft- 135ft and Scissor Lifts required for the CKJV Gorgon LNG MEI&C Project.
Boom Lifts/ JLG / Scissor Lifts ( No longer required)  
Closed
AMC1-MAN-097
Packs of Bright Steel Mesh (AS1443) required for construction for the CKJV Gorgon LNG MEI&C Project.
Bright Steel Mesh ( No longer required)  
Closed
CKJV-CON-117
Welding carbon steel or alloys pipe with FACW (Mechanized Flux Care Arc Welding) ranging from 300MM to 1800MM in stick build areas, inside modules and PARs. In addition welding of pipes with orbital tig welding of carbon steel or alloy pipe ranging from 50MM to 300MM in stick build areas of modules and PARs Scope includes supply of labor, equipment (maintenance repair) and supervision for work at AMC and Barrow Island.
Carbon Steel and Alloy Pipe Welding ( No longer required)  
Closed
CKJV-FAC-020
Supply all the Necessary Services for Cleaning and Maintenance for the Offices and Crib Rooms for the CKJV Gorgon LNG MEI&C Project.
Cleaning and Maintenance Services ( No longer required)  
Closed
TRGCTR-TRG-022
Supply a Competency Test for Crane Drivers for the CKJV Gorgon LNG MEI&C Project.
Competency Test for Crane Drivers. ( No longer required)  
Closed
BWI-MAN-040
Supply of Electric Compressors 250CFM-400CFM required for the Gorgon LNG BWI Project for the CKJV Gorgon LNG MEI&C Project.
Compressors- Electric ( No longer required)  
Closed
PTH-FAC-105
Supply of projectors screens video teleconference equipment and associated AV furnishings for the fit out of the CKJVs Perth CBD office
Conferencing Equipment ( No longer required)  
Closed
AMC1-MAN-003
Preparation of detailed Construction Drawings for Concrete Hard Stands, Temporary Supports to hold Pre-Assembly Modules for the CKJV Gorgon LNG MEI&C Project.
Construction Drawings ( No longer required)  
Closed
CKJV-MAN-045
6 x 3m Transportable Toilet Blocks (male and female) and single chemical units, required for Gorgon LNG Project
Construction site Toilet Blocks ( No longer required)  
Closed
CKJV-MAN-005
Supply of Long Span shelving for Sea Containers 6M x 12M with four shelves High x approx 198m Option of metal shelves or timber shelves for the CKJV Gorgon LNG MEI&C Project.
Container Shelving ( No longer required)  
Closed
AMC1-MAN-095
Supply of Pipes, Fittings and Flanges for Temporary Spools used for Blowing, Chemical Cleaning and Pressure Testing for the CKJV Gorgon LNG MEI&C Project.
CS Pipes, Fittings & Flanges ( No longer required)  
Closed
AMC1-MAN-096
Supply of various Valves- Ball, Check & Gate used for Blowing, Chemical Cleaning and Pressure Testing for the CKJV Gorgon LNG MEI&C Project.
CS Valves ( No longer required)  
Closed
CKJV-MAN-033
Supply of Carbon Steel Welding Electrodes required for Pipe & Structural Welding for the CKJV Gorgon LNG MEI&C Project.
CS/SS Weld Electrodes ( No longer required)  
Closed
PTH-HR-107
1 Provision Of Cultural Awareness Training2 Provision Of Written Resource Materials To Support Presentations
Delivery Of Cultural Awareness Training. ( No longer required)  
Closed
CKJV-MAN-043
Supply METAL drip trays suitable for placement under Equipment for the CKJV Gorgon LNG MEI&C Project.
Drip trays to suit Equipment ( No longer required)  
Closed
CKJV-HR-109
Provision of on site instant testing at Australian Marine Complex with as required follow up laboratory analysis and reporting back to CKJV. Capabilities for urine, swab and breatherlizers.All processes to relevant national standards. Vendors must be accredited to relevant standards.
Drug and Alcohol Testing on site ( No longer required)  
Closed
CKJV-MAN-080
Supply Electrical Cable Glands for the CKJV Gorgon LNG MEI&C Project.
Electrical Cable Glands ( No longer required)  
Closed
CKJV-MAN-048
Supply Power Electrical Cables designed for use on a 3-phase, 690/400V low voltage, 50Hz required for the CKJV Gorgon LNG MEI&C Project.
Electrical Power Cables ( No longer required)  
Closed
PTH-HR-101
Provision of Employeee Assistance Programesfor the duration of the CKJV Gorgon LNG MEI&C Project.
Employee Assistance Programs ( No longer required)  
Closed
(1/09/2014)
CKJV-MAN-041
Fencing / posts / fittings & gates for the stores lay down area for the CKJV Gorgon LNG MEI&C Project.
Fencing / posts / fittings & gates ( No longer required)  
Closed
CKJV-MAN-015
Supply the Necessary Fire Extinguishers Required for the CKJV Gorgon LNG MEI&C Project.
Fire Extinguishers ( No longer required)  
Closed
CKJV-CON-017
Supply the Necessary First Aid Equipment and Eye Wash Stations Requiredfor the CKJV Gorgon LNG MEI&C Project.
First Aid Equipment and Eye Wash Stations ( No longer required)  
Closed
AMC1-MAN-068
Supply all Necessary Flat Racks Required for the CKJV Gorgon LNG MEI&C Project.
Flat Racks ( No longer required)  
Closed
AMC1-MAN-050
Requirement for a 35 - 40 Tonne fork lift with tyne and container handling capabilities. A removable container spreader bar, air conditioned and possibilities of other options. Purchase with a buy back option or full lease option for the CKJV Gorgon LNG MEI&C Project.
Fork Lift - Container Type ( No longer required)  
Closed
CKJV-MAN-078
Gas Detector & Air/Dust sampling Equipment / Filters required for the CKJV Gorgon LNG MEI&C Project.
Gas Detector & Air/Dust sampling Equipment / Filters( No longer requir  
Closed
CKJV-CON-029
Supply of 5KVA to 250KVA Generators Required for the CKJV Gorgon LNG MEI&C Project.
Generator ( No longer required)  
Closed
AMC1-MAN-067
Supply all Necessary Grillage and Timber Required for the CKJV Gorgon LNG MEI&C Project.
Grillage, Timber ( No longer required)  
Closed
BWI-CON-026
Supply of Grounding Cables & Holders with class K W Copper Stranding for Gorgon LNG BWI Projectfor the CKJV Gorgon LNG MEI&C Project.
Grounding Cable ( No longer required)  
Closed
CKJV-MAN-047
Earth Cables, bars, connectors & terminals, tool kit, compression tool and dies, required for the CKJV Gorgon LNG MEI&C Project.
Grounding Material ( No longer required)  
Closed
CKJV-CON-016
Supply the Necessary Safety Harnesses Required for the CKJV Gorgon LNG MEI&C Project.
Harnesses ( No longer required)  
Closed
CKJV-MAN-034
Supply of Stainless Steel Hilti Studs and Grating Discs required for the CKJV Gorgon LNG MEI&C Project.
Hilti Studs & Grating Discs ( No longer required)  
Closed
CKJV-MAN-081
Supply of Hose Storage Cabinets required for the CKJV Gorgon LNG MEI&C Project.
Hose Storage Cabinets ( No longer required)  
Closed
AMC1-MAN-091
Hydraulic Hose, Fittings and 12/24v Crimping machine, inc dies, requiredfor the CKJV Gorgon LNG MEI&C Project.
Hydraulic Hose, Fittings and & Crimper ( No longer required)  
Closed
CKJV-MAN-062
Supply all Necessary Industrial Gasses O2/ Argon/ N2/ for the CKJV Gorgon LNG MEI&C Project.
Industrial Gasses ( No longer required)  
Closed
PTH-HR-100
Provision of employee related insurance entitlements for the duration of the CKJV Gorgon LNG MEI&C Project.
Insurances ( No longer required)  
Closed
CKJV-CON-118
Scope of work is to provide the personnel and necesary video equipment to perform an internal visual inspection of a 16,700mm (54.8ft) ID propane refrigerant storage sphere in Henderson. Inspection is to document the general internal surface condition, any areas of internal corrosion or fabricationtesting debris, confirmation of internal still pipe arrangement and positions per supplied drawings and confirmation of still pipe base connection details. Access to perform the internal inspection will be through the sphere''s top M1 manway and bottom N2 nozzle. The manwaynozzle details are ID of the M1 manway is 577.6mm (22.7in.) and ID of the N2 nozzle is 189mm (7.4 in.) and it has an internal vortex breaker positioned over the nozzle opening. The gap between the vortext breaker plate and sphere ID surface is 100mm (4 in.).
Internal Visual Inspection - ID Propane Refrigerant Storage Sphere( No  
Closed
AMC1-MAN-104
Provide lashing and tiedown services for CKJV onshore operations as detailed belowSupply of lashing and tiedown materials for the seafastening of preassembled structures, pipe racks and vessels. Supply includes, but is not limited to wire rope, turnbuckles, wire clamps, chains, strapping, and all associated lashing and tiedown material and equipment. Material supply shall be in accordance with the quantities, dimensions and specifications setout by sea fastening design drawings provided by CKJVInstallation of lashing and tiedown materials (supplied by Subcontractor as described above) for the seafastening of preassembled structures, pipe racks, and vessels, in accordance with the dimensions and specifications setout by seafastening design documents provided by CKJV. Installation works shall take place on ships moored at the Australian Marine Complex (AMC).Supply of all cranes, lift trucks, elevated work platforms, compressors, generators, tensioning equipment, testing equipment, vehicles, rigging, special tools and any other equipment required to fulfill the scope of work. All Equipment mobilised to the project site shall adhere to Project Specifications Provision of seafastening design services for minor preassembled equipment to be lashed down andor flatpacked. Seafastening design drawings and calculations to be prepared and submitted for review.Supply of lashing and tiedown Materials for seafastening of minor preassembled equipment to be lashed down andor flatpacked. Supply includes, but is not limited to wire rope, turnbuckles, wire clamps, chains, strapping, and all associated lashing and tiedown material and equipment. Material supply shall be in accordance with the quantities, dimensions and specifications setout by sea fastening design drawings provided by Subcontractor. Supply shall only proceed after CKJV approval (which includes a review by CKJVs Client and their Marine Warranty Surveyor) of design drawings and calculations.Installation of lashing and tiedown materials for seafastening of minor preassembled equipment to be lashed down andor flatpacked, in accordance with the dimensions and specifications setout by seafastening design documents provided by Subcontractor.Supply of all cranes, lift trucks, elevated work platforms, compressors, generators, tensioning equipment, testing equipment, vehicles, rigging, special tools and any other equipment required to fulfill the scope of work. All Equipment mobilised to the project site shall adhere to Project Specifications
Lashing and Tie-Down Services  
Closed
CKJV-MAN-064
Supply Engineering Lifting Studies for the CKJV Gorgon LNG MEI&C Project.
Lifting Studies ( No longer required)  
Closed
AMC1-MAN-054
Provide transport for goods and equipment In and Out of AMC/ Kwinana & Patricks for the CKJV Gorgon LNG MEI&C Project.
Local Transport ( No longer required)  
Closed
CKJV-HR-110
CKJV shall implement a third party provided program to train all personnel in the prevention of musculoskeletal injuries. The program shall be specific, detailed, monitored and performance measured and detail the resources required. An office repetitive strain injury prevention program shall also be implemented. Scope of work includes training all personnel in the prevention of musculoskeletal injuries, assessment of bad manual handling practices and recommendations and training for corrective techniques, ergonomics training and the program shall cover Barrow Island, AMC and Perth office locations.
Manual Handling/Ergonomics ( No longer required)  
Closed
CKJV-CON-109
Manual Material Takeoff from Engineering Drawings for the Gorgon MEI C ProjectScope of Work Perform manual material takeoffs on approximately 35 000 piping mechanical electrical and instrumentation drawingsJob Duration 3 4 monthsCompany Type Ideally we are looking for quality surveying or estimating companies to perform this role
Manual Materials Takeoffs from Engineering Drawings( No longer require  
Closed
AMC1-MAN-053
Carry out earthworks over approx 20 Hectares area at Local Facilities to improve and extend material lay-down and handling area.Work includes:- Resurfacing existing hardstand,- Clearing, cutting and leveling sand and grassed areas followed by application of 200mm limestone sub-base and new surface layer, &- Installation of storm water drainage.
Material Lay-Down Yard Earthworks / Resurface-Kwinana(No longer r  
Closed
PTH-HR-002
Supply Medical Assistance, D&A Testing, Project Medical Examination Prior to Mobilization to Site for the CKJV Gorgon LNG MEI&C Project.
Medical Assistance, D&A Testing, Project Medical Exam( No longer req)  
Closed
CKJV-MAN-035
Supply of Miscellaneous hardware items i.e. welding cable, cable lugs, cotter pins for the CKJV Gorgon LNG MEI&C Project.
Misc Hardware ( No longer required)  
Closed
CKJV-MAN-037
Supply of Miscellaneous Hardware i.e. Hilti eyebolt anchors, eyebolts, couplings, connectors, rods, Perforated pipe, tubing and tie wire for the CKJV Gorgon LNG MEI&C Project.
Misc Hardware ( No longer required)  
Closed
CKJV-MAN-008
Supply of Office Furniture for Workshop buildings and Warehouses for the CKJV Gorgon LNG MEI&C Project.
Office Furniture ( No longer required)  
Closed
BWI-CON-120
Assembly, erection and testing of approximately 50 oil filled transformers, up to 150 MVA, on Barrow island Work will include erection, assembly, insulation resistance test, winding resistance test, oil breakdown resistance test, dissolved gas test, moisture content test, protective devices testing, voltage ratio test.
Oil Filled Transformers ( No longer required)  
Closed
CKJV-CON-010
Supply all Necessary Open Sheds and Workshops Required for the CKJV Gorgon LNG MEI&C Project.
Open Sheds. ( No longer required)  
Closed
AMC1-MAN-092
Supply all Necessary Equipment and Services for Painting and Fire Proofing to be Done at the Gorgon LNG BWI Project for the CKJV Gorgon LNG MEI&C Project.
Painting and Fireproofing Contractor ( No longer required)  
Closed
CKJV-CON-004
Supply of Personal Protection Equipment ( Clothing, boots, Helmets, Hand & Eye protection etc) for the CKJV Gorgon LNG MEI&C Project.
Personal Protection Equipment ( No longer required)  
Closed
CKJV-MAN-076
Pipe Bender required for the CKJV Gorgon LNG MEI&C Project.
Pipe Bender ( No longer required)  
Closed
AMC1-MAN-065
Supply Necessary Pipe Caps Required if Not Supplied With Spools for the CKJV Gorgon LNG MEI&C Project.
Pipe Caps ( No longer required)  
Closed
AMC1-MAN-094
Supply & fabrication of Misc Pipe Supports such as angles, brackets, T-Posts, clamps for the CKJV Gorgon LNG MEI&C Project.
Pipe Supports ( No longer required)  
Closed
AMC1-MAN-084
Supply of approx White 1mm thk Plastic Sheeting x 4M wide for wrapping for the CKJV Gorgon LNG MEI&C Project.
Plastic sheeting ( No longer required)  
Closed
CKJV-CON-028
Supply of CS Plates for temporary structural activities and Crane Mud mats for the CKJV Gorgon LNG MEI&C Project.
Plates - Carbon Steel ( No longer required)  
Closed
AMC1-MAN-070
Supply of 6mm Polypropylene Ropes and Straps 2000-2500Kg for internal tie down work in Containers for the CKJV Gorgon LNG MEI&C Project.
Polypropylene Ropes & Straps ( No longer required)  
Closed
AMC1-MAN-057
Design and Supply Portable Office Containers, Crib Rooms & Toilet Facilities for the CKJV AMC Yard for the CKJV Gorgon LNG MEI&C Project.
Portable Office Containers, Crib Rooms and Toilets(AMC)( No longer req  
Closed
CKJV-MAN-044
Power Distribution boards - 230A to 630A for the CKJV Gorgon LNG MEI&C Project.
Power Distribution boards ( No longer required)  
Closed
CKJV-MAN-061
Supply all Necessary Preservation Lubricants/Oils Required for the CKJV Gorgon LNG MEI&C Project.
Preservation Lubricants/Oils ( No longer required)  
Closed
BWI-CON-079
Design, manufacture and supply complete PTFE slide bearing assemblies that are to be field welded or bolted to carbon steel structures by Purchaser for the CKJV Gorgon LNG MEI&C Project.
PTFE slide bearing assemblies ( No longer required)  
Closed
CKJV-MAN-046
Industrial Plug & Wall Sockets and Zone 1 Disconnect Switch meeting hazardous qualifications of (IECEx or ANZEx) 3.4, for the CKJV Gorgon LNG MEI&C Project.
Receptacles and Disconnect Switches ( No longer required)  
Closed
CKJV-MAN-031
Supply of Rigging Equipment requiredfor the CKJV Gorgon LNG MEI&C Project.
Rigging Equipment ( No longer required)  
Closed
CKJV-MAN-086
Supply Necessary Sacks for Bag and Tag Required for the CKJV Gorgon LNG MEI&C Project.
Sacks For Bag and Tag ( No longer required)  
Closed
CKJV-MAN-009
Supply of 4 Nos x 6M safe loading access platform or picking ladders required for loading and unloading trucks at various facilities in Perth for the CKJV Gorgon LNG MEI&C Project.
Safe Loading Access Platform ( No longer required)  
Closed
CKJV-CON-019
Supply all Necessary Safety Signs Requiredfor the CKJV Gorgon LNG MEI&C Project.
Safety Signs ( No longer required)  
Closed
CKJV-MAN-012
Supply of Scan Stickers and Scanners for a Control Measure of Materials for the CKJV Gorgon LNG MEI&C Project.
Scan Stickers/Scanners ( No longer required)  
Closed
CKJV-FAC-006
Supply of 40ft and 20ft Containers with and without shelving required for the CKJV Gorgon LNG MEI&C Project.
Sea Containers (No longer required)  
Closed
AMC1-MAN-085
Design and Supply of Sea Fastenings, Transport Beams and Lifting Beams for the CKJV Gorgon LNG MEI&C Project.
Sea Fastenings, Transport Beams & Lifting Beams( No longer required)  
Closed
CKJV-FAC-021
Supply all Necessary Security Access Cards Requiredfor the CKJV Gorgon LNG MEI&C Project.
Security Access Cards ( No longer required)  
Closed
AMC1-MAN-072
Supply Service Trucks for servicing fleet of light and heavy vehicles & Plant for the CKJV Gorgon LNG MEI&C Project.
Service Truck ( No longer required)  
Closed
CKJV-MAN-074
6 -20mm shims - AS3679.1-300 and 2 & 3mm galvabond shims - AS1397 G2 Z275, required for the CKJV Gorgon LNG MEI&C Project.
Shims ( No longer required)  
Closed
CKJV-MAN-077
Sound level Meters / Calibrators & Accessories, Class/Type 2 required for the CKJV Gorgon LNG MEI&C Project.
Sound level Meter / Calibrator & Accessories ( No longer required)  
Closed
CKJV-CON-120
PROVIDE SPECIALTY ALLOY PIPE WELDERS TO WELD CS, SS, DUPLEX, SUPER DUPLEX, INCONEL, INCOLOY IN THE FOLLOWING PROCESSES GTAW, SMAW, FCAW. ALL ROOT AND HOT PASSES TO BE GTAW, FILL AND CAP TO BE EITHER SMAW OR FCAW AS DIRECTED. SCOPE WILL RANGE FROM STICK BUILD TO CLOSUREGOLDEN WELDS. CLOSUREGOLDEN WELDS WILL HAVE VARIOUS HOLD POINTS THAT MUST BE STRICTLY ADHERED TO. ALL WELDERS WILL BE REQUIRED TO PASS A SERIES OF WELD TEST AS REQUIRED BY THE PROJECT. CONTRACTOR WILL SUPPLY ALL SUPERVISION, EQUIPMENT, SMALL TOOLS, AND CONSUMABLES. SUBCONTRACTOR TO SUPPLY LABOUR ONLY.AMC 15 PIPE WELDERS JAN 2013 DEC 2013. BWI 30 PIPE WELDERS JAN 2013DEC 2014.
Specialty Welders ( No longer required)  
Closed
CKJV-MAN-082
Supply of Spreader Bar assemblies including rigging for loading & unloading heavy lifts for the CKJV Gorgon LNG MEI&C Project.
Spreader bar ( No longer required)  
Closed
CKJV-MAN-038
Supply Standard size Pallets to Australian Standard AS1604 H3 for the CKJV Gorgon LNG MEI&C Project.
Standard Pallets ( No longer required)  
Closed
AMC1-MAN-066
Supply Steel Cage Bins for Storage for the CKJV Gorgon LNG MEI&C Project.
Steel Cage Bins For Storage ( No longer required)  
Closed
CKJV-MAN-039
Supply Standard size Steel Pallets to for the CKJV Gorgon LNG MEI&C Project.
Steel Pallets ( No longer required)  
Closed
CKJV-MAN-030
Supply of Flat Bar (inc SS), Round Bar (inc MS-34), Angle, PFC & Plate to A36, AS3678 250 & AS3679.1-300 required for the CKJV Gorgon LNG MEI&C Project.
Structural Steel Bulks ( No longer required)  
Closed
CKJV-CR-117
Calling for the registration of interest to supply promotional items to the CBI Kentz Joint Venture for various activites such as recruitment HSSE awards incentives etc
Supply of Project Promotional Items ( No longer required)  
Closed
BWI-CON-027
Supply of Permanent Survey Markers - 100 x 100 Brass Plaque Pyramid for Gorgon LNG BWI Project for the CKJV Gorgon LNG MEI&C Project.
Survey Markers ( No longer required)  
Closed
AMC1-MAN-055
Supply of 160M Temporary Fencing for a period of 12 months for the CKJV Staging yard for the CKJV Gorgon LNG MEI&C Project.
Temporary Fencing ( No longer required)  
Closed
AMC1-MAN-069
Design and Supply Temporary Work Foundation and Hard Stands including labour for the AMC Yard for the CKJV Gorgon LNG MEI&C Project.
Temporary Work Foundation and Hard Stands( No longer required)  
Closed
CKJV-MAN-075
Threading Machines required for the CKJV Gorgon LNG MEI&C Project.
Threading Machines ( No longer required)  
Closed
AMC1-MAN-052
Supply of 2,000 Timber Gluts to Australian Standard AS 1604 (H3) 50mm x 50mm x 1200mm delivered CKJV AMC Facility for the CKJV Gorgon LNG MEI&C Project.
Timber Gluts ( No longer required)  
Closed
CKJV-CON-032
Supply, store, manage and provide tools and consumables for the CKJV Gorgon LNG MEI&C Project at AMC & Barrow Island. Supplier shall use own materials tracking and scanning systems.
Tools and Consumables Supply ( No longer required)  
Closed
TRGCTR-TRG-001
Require interest from an adequately qualified Training Resource Organisation for the Training of Personnel in First Aid for the CKJV Gorgon LNG MEI&C Project.
Training for First Aid Personnel ( No longer required)  
Closed
AMC1-CON-104
Perform transport route study to define the dimensional envelope and weight constraints as determined by relevant obstructions and state local regulations for the transport of large items between the following three 3 locations Issue report inclusive of maps photos graphs etc summarizing findings and providing recommendations Locations listed below: 1. Australian Marine Complex 124 Quill Way Henderson WA 6166;2. Patrick Warehouse Facility Cnr Rockingham Russell Rds Henderson WA 6166; 3. Lot 15 Mason Road Kwinana Beach WA 6167
Transport Route Study ( No longer required)  
Closed
PTH-HR-108
Travel Services company that is capable of setting up satellite office in the CKJV office in Perth. The Company must be capable of doing onsite ticketing, have own IT capabilities and have 24 hour assistance. Other requirements will be capability to provide back up personnel due to cyclone around Barrow Island to be able to quickly evacuate 1,500 to 2,000 employees quickly to the Perth area. Peak estimate would be 24,250 flights per year. Full scope will be provided to interested parties at tender.
Travel Services ( No longer required)  
Closed
(1/09/2014)
CKJV-MAN-042
2 way hand held Radios for Construction and Crane communication base radio set up and for General Use on Site for the CKJV Gorgon LNG MEI&C Project.
Two Way Radios ( No longer required)  
Closed
CKJV-MAN-049
To supply Various Electrical Items to provide Lighting and Power for the CKJV Gorgon LNG MEI&C Project.
Various Electrical Items ( No longer required)  
Closed
CKJV-CON-025
Supply of Utility Dual Cab Vehicles, 12 and 20 Seater Busses, Prime Movers, 3T, 5T and 10T Trucks, Semitrailers for the CKJV Gorgon LNG MEI&C Project.
Vehicles- Utes, Busses and Trucks ( No longer required)  
Closed
CKJV-MAN-011
Design and Supply a Racking System for the Warehouses used for the CKJV Gorgon LNG MEI&C Project.
Warehouse Racking System ( No longer required)  
Closed
AMC1-MAN-060
Supply Water and Ice to various facilities around Perth for the CKJV Gorgon LNG MEI&C Project.
Water & Ice ( No longer required)  
Closed
CKJV-FAC-089
Supply of 10000L Water Truck for Dust control for the CKJV Gorgon LNG MEI&C Project.
Water Truck ( No longer required)  
Closed
CKJV-MAN-073
Supply of Various Welding Machines, AUT Buggies, Gullco Compact FCAW Oscillators (AS compliant) and LN25 Pro, plus various control and Welding Cables, diesel Welders, Wire Welders, Welding Leads & Rods - required for the CKJV Gorgon LNG MEI&C Project.
Welding Machines ( No longer required)  
Closed
PTH-CON-093
Design and Supply Winter Jackets for May 2012 for the CKJV Gorgon LNG MEI&C Project.
Winter Jackets ( No longer required)  
Closed
CKJV-FAC-023
Supply all Necessary Work Benches, Pipe Fitter Tools, Boilermaker Tools Required for the CKJV Gorgon LNG MEI&C Project.
Work Benches, Pipe Fitter Tools, Boilermaker Tools.( No longer require  
Closed
BWI-CON-114
Subcontractor s Scope Of Work that is scheduled for execution during 2013 is for Cable preparation termination and plug in connection Cables are 630 mm single core armoured size 5 S In addition testing scope of work will include phasing check insulation resistance measurement DC sheath test 10kvDC and AC high voltage test which will require a resonant frequency HV test Early listing due to long lead items require to perform SOW
132KV Cable Terminations Subcontract  
Awarded
(24/6/2013)
View
BWI-CON-118
Perform a calibration on all 2073 PSV''s (pressure afety valve) and 303 TSV''s (temperature relief valve) on Barrow Island
Calibration on PSV''s and TSV''s  
Awarded
(10/1/2014)
PTH-FAC-099
Interior fit-out of Perth CBD office space. 1,100 m2. Includes construction of new interior walls and glazing, installation of free-issue office furniture, upgrade and rearrangement of HVAC, plumbing, lighting & IT Systems for the CKJV Gorgon LNG MEI&C Project.
CKJV CBD Project Office Fit-out  
Awarded
(12/2/2012)
View
CKJV-CON-018
Supply Diesel Fuel for the CKJV Gorgon LNG MEI&C Project.
Diesel Fuel  
Awarded
(1/6/2012)
View
AMC1-MAN-051
Supply of 2T electric forklift to be used in the warehouse, As well as a 3,6,16,20 and 32T Fixed Mask and Telescopic Forklifts for the CKJV Gorgon LNG MEI&C Project.
Fork Lift  
Awarded
(27/7/2012)
View
CKJV-CON-024
Cranes Hire- 20T to 200T required for the CKJV Gorgon LNG MEI&C Project.
Frana Crane, Rough Terrain Crane, Hire Mantis  
Awarded
(3/8/2012)
View
BWI-CON-116
STICK BUILD GRE PIPING To install and fit up approximately 335 meters of pipe, sizes from 50mm to 500mm and with approximately 100 joints, sizes from 50mm to 500mm that require fitting and lamination joints. SWHU GRE PIPING There are approximately 292 joints ranging from 50mm to 350mm that require fitting and lamination joints.Subcontractor to supply all labour, tools and consumerables.
GRE Pipe Fit  
Awarded
(9/12/2013)
View
BWI-CON-080
Scope of Work to include1 Taking grout specimens of Cementitious NON SHRINK grout2 Transport and storage of cubes3 Compression testing of cubes and4 Preparation of NATA endorsed reports
Grout Testing on BWI  
Awarded
(17/5/2012)
View
CKJV-FAC-090
Supply of Lighting towers required for the CKJV Gorgon LNG MEI&C Project.
Lighting Towers  
Awarded
(27/7/2012)
View
CKJV-CON-119
Line marking of roadways, give ways, stop sign enty and exit road markation and car bay marking for Mason Road laydown area in Henderson.
Line Marking of Roadways  
Awarded
(30/4/2013)
View
AMC-CON-115
Minor civil works and maintenance on a call out basis at Henderson work yard.Works could include forming, pouring and placing concrete plinths,road sweeping,localized grading, trenching and drainage, localized repair of chip and seal, hardstand (may require weekend work) and localized cut and fill including ground and pad prep for cranes
Miscellaneous Civil Works  
Awarded
(24/5/2013)
View
CKJV-CON-088
Supply a NDE Contractor for the CKJV Gorgon LNG MEI&C Project.
NDE Contractor  
Awarded
(5/7/2012)
View
AMC1-MAN-083
Perform all the NDT services at CKJV AMC Facility for the CKJV Gorgon LNG MEI&C Project.
NDT Services  
Awarded
(5/7/2012)
View
PTH-FAC-106
Supply of1 Executive workstation boardroom type chairs for the fit out of CKJVs Perth CBD office2 Workstations partition screens for the fit out of CKJVs Perth CBD office3 Executive workstation boardroom type chairs for the fit out of CKJVs Perth CBD office4 Loose furniture for the fit out of CKJVs Perth CBD office5 Office storage units and Compactus document storage units for the fit out of CKJVs Perth CBD office
Office Fit-out  
Awarded
(12/2/2012)
CKJV-CON-116
Subcontractor s Sope Of Work is to develop method statements and operate a lube oil program for critical lube oil system for equipment on both Barrow Island and at CKJV Onshore Facilites Henderson WA Cleaning of lube oil systems associated with compressors and other rotating equipment items with pressurized lube oil or hydraulic oils systems A minimum acceptance criteria shall be in accordance with API 614 4 3 3 7 1 which defines particle limits per table E 6 for 100 mesh screens
Oil Flushing Subcontract  
Awarded
(14/4/2014)
CKJV-CON-111 Pipe Pigging Subcontract Download PDF (32.79 kb)
Awarded
(24/6/2014)
View
CKJV-CON-115
Subcontractors shall be capable of digital recording and equipment shall be electrical or induction type for use on both Barrow Island and at CKJV Onshore Facilites Henderson WA Subcontractors shall supply insulating materials and attachment mechanisms T C and extension wire recorders controllers cables etc
Post Weld Heat Treatment Subcontract  
Awarded
(5/7/2012)
View
CKJV-HR-107
Subcontractor s scope is the manufacture and fitting of prescription safety glasses for personnel at the Onshore Operation areas of the Gorgon MEI C projectSubcontractor willObtain employee eye prescriptions and approved project order form from project human resources departmentObtain the appropriate safety glasses based on prescription and project guidelinesDeliver the safety glasses to the approved work site and fit the glasses on the employeesThe Subcontract Work shall be carried out at all onshore operational areas for the Gorgon MEI C Project excluding Barrow Island Fitting services will only be performed in the administrative office building at each site
Prescription Safety Glasses Supply  
Awarded
(17/7/2012)
View
CKJV-MAN-105
Supply, operate and maintenance of HP Compressors, LP Compressors, Boosters, Filters, Dryers, HPLP Pneumatic Hoses, Manifolds and associated tools and consumables for Pressure Testing and Blowing activities both for Onshore Operations (Henderson) and Offshore Operations (Barrow Island). The scope will also include supply of competent personnel to maintain, setup for test, advise and partake in the pressure testing and blowing of pipe. Subcontractor is to supply own tool container and office as a containerised unit.Sample list of main equipment required but not limited to HP Pneumatic Hoses with Whip Checks half inch to three quarter inch, WP 200Bar BP 250Bar, HP Pneumatic Hoses with Whop Checks 2 " WP 900Bar BP 1500Bar, 1070 CFM 24 Bar Oil Free Dry Air Compressor, 1200 CFM Desiccant Dryers, Coalescent Fliter 0.3MgsM, Booster WB12 to 150Bar
Pressure Testing and Blowing Activities  
Awarded
(25/11/2013)
AMC1-MAN-103
Supply all consumables materials and equipment for post weld heat treatment services and reporting at the Henderson Facility for the CKJV Gorgon LNG MEI C project
PWHT Henderson  
Awarded
(5/7/2012)
View
CKJV-CON-122
Subcontract for the Provision of services of a National Board of Boiler and Pressure Vessel Inspectors (NBBI) R Stamp accredited repairer at both AMC and Barrow Island
R Stamping  
Awarded
(6/5/2014)
BWI-CON-123
Provision of services to perform installation of prefabricated Wind Wall Panels on the Mixed Refrigerant Compressor Building (TAG1). Total Area Of Wind Wall 1500m2(approx.)Installation of Custom Blue Orb sheeting and ridge cap on the roof of the Mixed Refrigerant Compressor Building (TAG1). Total Area Of Roof 1200m2 (approx.), equivalent to 132 roof sheets (10m x 0.762m). Installation of prefabricated Wind Wall Panels on the Propane Refrigerant Compressor Building (TAF1). Total Area Of Wind Wall 1500m2 (approx.). Installation of Custom Blue Orb sheeting and ridge cap on the roof of the Propane Refrigerant Compressor Building (TAF1). Total Area Of Roof 1200m2 (approx.), equivalent to 132 roof sheets (10m x 0.762m). Scope of work shall include tools required to perform the installation and any cutting, cutouts and make good coating repairs associated with this installation work
Roof Sheeting and Wind Walls  
Awarded
(1/12/2014)
BWI-CON-117
Rope access crews to remove plastic strapping, transport steel, temporary steel, inspection and any other jobs that may require the services of rope access on Barrow Island
Rope Access  
Awarded
(28/6/2013)
View
CKJV-CON-007
Supply Scaffold Material, Scaffold Errection, Modification and Removal. Powered Scaffold will be considered for the CKJV Gorgon LNG MEI&C Project.
Scaffolding  
Awarded
(14/6/2013)
View
AMC1-MAN-058
Supply Security Services for Off Island Yards for the CKJV Gorgon LNG MEI&C Project.
Security Services  
Awarded
(18/6/2012)
View
CKJV-CON-112
Subcontractor s Scope Of Work is to supply maintain and operate compressors for Pneumatic Testing and line blowing on both Barrow Island and at CKJV Onshore Facilites Henderson WA Will be required to provide a full description of capabilities to meet our requirements Sub Contractor will be required to submit company HSSE plan and company procedures for equipment to be used
Subcontract for Compressors for Pneumatic Testing & Line Blowing  
Awarded
(15/5/2013)
View
AMC1-MAN-013
Supply all Necessary Survey Checks to Ensure that all Work Preformed at AMC will be Built According to Specification and Drawings for the CKJV Gorgon LNG MEI&C Project.
Surveyors  
Awarded
(24/4/2012)
View
BWI-CON-121
Testing of protective relays to ensure that they are properly set and that they satisfy the purpose for which they are intended.
Testing of Protective Relays  
Awarded
(20/12/2013)
View
BWI-CON-119
Perform the testing of Tight ShutOff (TSO) valves. Set presure ranges from 50kPag4500kPag. Inletoutlet sizes range from DN25DN500. Subcontractor is required to submit Health and Safety Plan, Method Statement and ITP''s for approval
Testing of TSO Valves  
Awarded
(10/1/2014)
BWI-CON-122
Hire of equipment for the following items on BWI, Torque Wrenches with range up to 600KPA, Torque Pumps, Torque Heads from 32mm to 95mm, Tensioning Pumps, Tensioning Heads from 1.5 " bolts to 3.5 " bolts, Flange Facing from 25mm to 1800mm, Pipe Cutting and Bevelling From 25mm to 1800mm, Calibration Equipment and Supply Technicians to perform work and calibrate and repair as required. The equipment will be required for construction, pre commissioning and commissioning scope for the torque and tensioning of all flange joints and any other items (eg rotating equipment, static equipment and structures).
Torque & Tensioning  
Awarded
(25/11/2013)
View
BWI-MAN-123
Supply, mobilize and maintain two (2) tower cranes to BWI Gorgon ProjectCranes shall be Favelle Favco M2480D Tower Crane or approved equal, Dry Hire.To be supplied with positive lock hook blocks on main and auxiliary as well as a crane rescue davit.Mobilization and demobilization of cranes to AMC Henderson, WA.Shipment to BWI from AMC will be provided by CKJV.Supply rigging crew and fitter for erection and dismantling on BWI.Supply technicianmechanic as needed for service, maintenance and repair.Rigging crew and service technicians will be required to work to current CBI constructors Gorgon Project Greenfield Agreement or approved equal.Rental period is not fixed and is estimated at 24 months.First crane to be available for AMC mobilization in July 201.3Crane 1 to be supplied with 74 meter main boom, 30 meter fly jib, 28 meter tower, 10mx10m travel base suitable for SPMT movement, 36 meter crane deck height.Approximately 580 tn ballast on travel base
Tower Cranes - BWI  
Awarded
(5/8/2013)
View
AMC1-MAN-059
Supply all Necessary labour and other resources to clear and remove all waste from all Onshore yards for the CKJV Gorgon LNG MEI&C Project.
Waste Removal  
Awarded
(17/10/2012)
View
 


[ Terms of Use ] [ Privacy Policy ]